Egg Tray Dryer

Egg tray dryer is a necessary part of egg tray production line. Beston Group Co., LTD. has an efficient solutions to choose from – a metal egg tray dryer. It has both advantages and limits. With years of experience and 120+ successful cases, we have some tips for you to select a suitable egg tray dryer machine. If you have any questions, please contact us for details.

Metal Egg Tray Dryer Machine

Metal egg tray dryer is the main difference between manual and automatic egg tray machines. It is suitable for all models, especially for large-scale egg tray plant, like 8-side egg tray machine. It is easy to operate, transport, and install. Also, it can be muti-layer to save your space. But it is expensive. And if you use coal as fuel, it is suggested to have a hot air stove to purify the smoke and extend the service life of the dryer. If you have enough budget, it is a great choice for you. Beston supports flexible egg tray production line. Please contact us now to get a customized plan!

BTF5-8 to Russia
BTF4-4 to Iraq
BTF5-8 to Egypt

How to Choose A Suitable Egg Tray Drying System?

Different egg tray drying lines have different features. What you need to do is to choose a suitable dryer for your egg tray production line. Let’s review its advantages and limits briefly.

Metal Egg Tray Dryer Machine

Advantages

  • Easy to transport and install
  • High drying efficiency
  • Small floor space required

Limits

  • High investment cost
  • Limits in heating fuel (wood and coal are not available)

Beston Tips

Beston Group Co., LTD. has years of experience in manufacturing and exporting egg tray machines. So we are professional to offer you some advice. If you want to set up egg tray making business, please contact us for details.

    CONTACT US

    Please Feel Free To Give Your Inquiry In The Form Below.

    Please specify your requirement by referring to the following aspects:

    1-What kind of solution will meet your demand? (Key point)

    2-What kind of material and expected end product are you planning to have? (Right solution begins from material and product)

    3-When is the project supposed to be running? (Key info for A-Z project programming)

    4-Budget for machinery purchasing? (Key info for right model)

    5-Points that you really focus on. (Customized service from our project consultant)

    Your Message (required):

    Contact Us Now!
    X Contact Us Now!

      The senior project manager will contact you within 24 hours. Please check your email inbox in time.